LINXS 2019 Construction Photo Gallery
Click or tap a thumbnail below to view the image in a larger size. For mobile device users, we recommend viewing in landscape mode for the best experience.
Click here to view the most recent construction photos.
December 2019
-
Worker assembles crane that will be used in the construction of the cast-in-drilled-hole piles -
Rebar cage used to construct the station columns is erected at the future CTA East station -
Crews build barrier walls at Parking Structure 4 (formerly a connector bridge between parking structures) -
The Upper West Way barrier wall is constructed -
Crews perform demolition work and remove exterior panels from the former hangar -
The future Maintenance and Storage Facility site is prepared for the first foundation pour -
Crews commence placing concrete for the first Maintenance and Storage Facility foundation footing -
LINXS craft ties rebar -
LINXS proceeds with concrete placement at the Maintenance and Storage Facility
November 2019
-
Crews continue concrete placement inside the Central Terminal Area (CTA) -
Steel reinforcement cage is set in the cast-in-drilled-hole pile at the future CTA East station
-
Crews utilize a tremie pipe to place concrete inside the cast-in-drilled-hole pile -
Concrete placed at Automated People Mover's first cast-in-drilled-hole pile at future CTA East station
-
Survey crews providing layout for CIDH installation -
Traffic management is critical to the safety of the traveling public during construction activities -
While placing concrete, worker takes measurement to confirm depth -
Subcontractor excavating CIDH with concrete tremie rack in the foreground -
Work continues with cast-in-drilled-hole pile installation at future Intermodal Transportation Facility-West
October 2019
-
Automated People Mover falsework over the Metro tracks
-
First cast-in-drilled-hole pile excavation -
Cast-in-drilled-hole pile casing for the Automated People Mover project -
Steel reinforcement cage set in cast-in-drilled-hole pile -
Concrete placed at first cast-in-drilled-hole pile -
First cast-in-drilled-hole pile concrete placement -
Cast-in-drilled-hole pile materials organized for for the first pile -
Cast-in-drilled-hole pile excavation at the future CTA East station -
Measuring the depth of the first cast-in-drilled-hole pile in the CTA
Renderings
-
People Mover train above the terminal loop -
Central Terminal Area -
People Mover as it rides by iconic Theme Building -
Automated People Mover Guideway -
Intermodal Transportation Facility East -
People Mover train pulling into a station -
Intermodal Transportation Facility West -
Escalators leading to the Automated People Mover station -
Center CTA Station Interior